Rehabilitation Design


Ulverstone Bypass Duplication, Bass Hwy
2005-06: Preparation of batter stabilisation specifications and a roadside landscape plan

Eildon Dam
2005: Review and redesign rehab and reveg documentation for the Eildon Dam improvement
project, Eildon, Victoria.

Meander Dam
2005: Design a rehabilitation and revegetation plan for native quoll habitat restoration as a
component of the dam development proposal

Thompson & Brett (Engineers)
2004-05: Revegetation and landscape plans for large residential subdivision

Hercules Mine Site, West Coast, Tasmania
2004-present: Preparation of the ‘Interim Revegetation Strategy Report’, a component of the
Hercules Mine Site Rehabilitation Plan for the highly degraded abandoned mine site near
Rosebery.

Telstra
2004: rehabilitation guidelines for disturbed threatened species populations at Warnambool,
Victoria.
2004: rehabilitation guidelines for tunnel erosion affecting telecommunication assets at
Meredith (near Ballarat), Victoria

URS/Meridian Energy ‘Dollar Wind Farm Proposal’
2004 - 05: Delivery of a ‘Weed and Pathogen Management Plan’ to be incorporated in to the
project’s DP & EMP for the 1700ha proposed wind farm in Victoria.

Duke Energy
2000-04: Development of rehabilitation specifications for the 400 km Duke Energy gas
pipeline covering Standard Operating Procedures (SOP) and both standard and special area
plans (SAP). (Victoria and Tasmania)

Basslink Project
2003-05: Development of rehabilitation specifications for the Victorian and Tasmanian land
sections of overhead and underground cable easement.

Brighton City Council
2003: identification, mapping and remedial specifications for extensive tunnel, gully and
sheet erosion in dispersive soils.

John Holland Group
2003-present: Preparation of rehabilitation plans for several tele-communication tower
construction sites around Tasmania (Cambridge, Domain, Montrose, Blue Hill, South Hobart,
Flinders Island), including remedial strategies for Rare and Threatened Species disturbance
on Flinders Island.

Wellington Park Management Trust
2001: Preparation of track maintenance strategies and cost estimate preparation for fire-trail
and recreational tracks located within Wellington Park.

Renison Limited
1998: Preparation (part) of Ring River Organic Soil Source DPEMP.

Department of Environment and Land Management
1997: Preparation of a rehabilitation plan and costing for the Mt McCall Road, World
Heritage Area.
1991: Disturbances within the Day Walking Area of Cradle Mountain National Park.

Department of Transport
2003: Audit and remedial measures design of erosion and sediment control failures at the
Gunns Hills Climbing Lanes, Arthur Hwy road construction site.
1997-98: Provision of roadside batter design for the Ridgley truck route.
1995: Preparation of rehabilitation and stabilisation specifications for the West Coast Link
Road.
1995: Provision of roadside batter design for the Lyell Highway at Granton.
1993: Roadside, batter and local provenance landscape for the Paradise Gorge on the Tasman
Highway and the Epping Forest Duel Carriageway on the Midlands Highway.

   
 
Department of Transport National Highway Rehabilitation/ Stabilisation
  Epping Forest
upgrade 1996.
Area following
rehabilitation
works 1999.
   
  Comalco
1995: Stabilisation and revegetation at the Comalco SPL Dump sites and preparation (part) of
the concept design for their award winning wetland system

Forestry Corporation
1994: Stabilisation guidelines for the Teepookana Road.

Hydro Electric Corporation
1997: Preparation of an Environmental Construction Plan for the Huxley Hill Wind Turbine
Site.
1994: Decommissioning plan preparation (part) for the Tarraleah works depot, Paddy's
Quarry Landfill and abandoned land fill sites.
1994: Decommissioning of the Butlers Gorge Trans-line in the WHA.

Beaconsfield Mine Joint Venture
1991-1996: Rehabilitation works at Beaconsfield and Golconda Tailings Retreatment Sites.

Benders Quarry
1991: Rehabilitation plan preparation.

Savage River Mine
1990-97: Preparation (part) of the specifications for the decommissioning of the .Savage
River Mine.
   
 
Hydro Electric Corporation Great lake Intake Rehabilitation
  Rehabilitation of forty year old clay pit showing benefits of browsing animal proof fencing.  
   
 
Hydro Electric Corporation:
Poatina Works Depot Abandonment and Rehabilitation
Depot during
operation.
April 1994:
Site following demolition, site preparation and revegetation
treatment.
February 1995.
July 2000.