Rehabilitation/Revegetation Design and Implementation

- General
- Quarry Rehabilitation
   
  General

Powerco
2005: Rehabilitation and revegetation of several kilometres of gas pipeline easement within the State Road Network (Brighton and Launceston, Tasmania)

Track Closure (Private Client)

2005: Rehabilitation and revegetation of 4WD/motorbike tracks on private bush reserve, Tranmere, Hobart.

Clarence City Council

2004-2006: Rehabilitation and revegetation specifications and implementation for the CCC ‘Waste-Water Re-Use Pipeline’

Hydro Tasmania – Poatina Power Station Surge Dam

2005: Rehab/reveg design and implementation following dam construction

Parks and Wildlife Service (DTPHA)

2004-2005: Rehabilitation of over 42km of fire trails within the Arthur Pieman Conservation Area and Tikkawoppa Plateau Regional Reserve, West Coast.

Tunnel Erosion Remediation
2004: remediation guidelines for several tunnel erosion occurrences (Gunners Quoin & Honeywood Drive – Brighton; Petcheys Bay)

DPIWE
1999-2001: Savage River mine township and surrounds.

Mineral Resources Tasmania
2001-02: Merrywood Coal Mine.
1997-99: Rossarden Mine Site.

Hydro Electric Corporation
1997: Historic disturbances at Strathgordon and Scotts Peak, including World Heritage Areas.
1997: Historic disposal and pipe manufacturing sites at Poatina.
1997: Revegetation works at Arthur’s Lake Wilburville.
1995: Rehabilitation works on the Mueller Road roadsides
1994-96: Decommissioning and rehabilitation of the Poatina Works Depot and the Tarraleah Works Depot.
1993-94: Clean-up at the Anthony Power Development and the St Leonards Works Depot. 1992-93: King River Power Development, Anthony Power Development and the Strahan to Queenstown Feeder Line Easement.

Telstra/ABB

2005: rehabilitation of illegally disturbed rare and threatened species populations at Brighton
2004-05: rehabilitation of illegally disturbed rare and threatened species populations on Shark Road, Midway Point.
1996-97: High altitude rehabilitation following the construction of the Mt Wellington Broadcasting Tower.
1993-95: Rehabilitation works on optical fibre cable lines.

RGC

1993-99 (On-going): RGC Renison Bell mine site, including preparation of close-out model, rehabilitation specifications and on-going site rehabilitation.

Hobart Regional Water Board
1994-99: Easement rehabilitation.

BHP
1993: Exploration track closure at Garfield River.

King Island Scheelite
1992-97: Revegetation and on-going maintenance of rehabilitation works.

CRA
1991: CRA Zeehan mining leases. Western Metals 1990-1999: Hellyer, Que and Luina Mine sites and tailings deposits.

Telstra: High altitude rehabilitation following the construction of the
Mt Wellington Broadcasting Tower.
  Broadcasting stage area
during consruction
Tower staging area
following rehabilitation
   
 
King Island Scheelite Mine: Abandonment and Rehabilitation.
During Operation
August 1996: Five years after decommissioning and four years after the implementation of revegetation works.
November 1997
 
   
 

Quarry Rehabilitation

DIER
1999-2006: Turners Quarry - Bruny Island, Spikey Bridge, Black Bridge, Brandy Bottom,
Paradise Gorge, Tinderbox, Red Hill, Great Lake (various) quarries.

Department of Defence
1998: Stony Head Facility.

Readymix
1991-present: Mornington Quarry.
K&D
1991-1995: Oyster Cove Clay Pit.

BHP-Temco
1991: Glover's Bluff and North Lune Quartzite Pits.

Pioneer
1990-present: Flagstaff Gully Quarry.

Hydro Electric Corporation

1992-97: Several construction quarries.

King Island Scheelite
1992-94: Borrow pits.

Department of Transport
1995-96: Quarries associated with the West Coast Link Road.

Roadside Rehabilitation Planning and Implementation

Department of Transport
2005-06: Conduct roadside degradation document review and site inspection for over 100
degraded roadside sites. Devise a prioritised ranking system, remediation guidelines and
costings.
1999-00:
Murphy’s Flat Roadside batters.
1998: Habitat preservation works at Longford.
1997: Three sites along the National Highway at Ulverstone, South Esk and Epping Forest.
1995-96: West Coast Link Road roadsides and quarries.
1995-96: Bridport Main Road Roadsides.
1992-94: Guildford-Hampshire Development Road roadsides.
1991-1994: Cradle Mountain Link Road roadsides.

Hydro Electric Corporation
1992-93: Mueller Road Roadsides (WHA).

Readymix Mornington Quarry Rehabilitation
May 1992.
May 1996.
November 1999.
 

 

 
Department of Transport National Highway Rehabilitation/Stabilisation
  12 Year old disturbance at
Ulverstone requiring
rehabilitation/ stabilisation.
Area following works
showing stabilising exotic
grass cover. October 1999.